Stocks · News reference
Dow Gains 100 Points; Chicago PMI Falls In August
US stocks up, Dow gains 100 points, S&P 500 and NASDAQ also rise. Communication services up 1.1%, technology down 0.3%. Chicago Business Barometer dips.
Reference Details
Connected Markets
Poisar stores the source's headline, summary and market tags for reference. Reporting and full article text remain with the original publisher.
- Source
- benzinga
- Observed
- Checked
- Cadence
- Captured once, then retained as an archive reference
- Status
- fresh
Keep reading
Related Headlines
Dow Surges 250 Points; US Weekly Jobless Claims Fall
U.S. stocks mixed: Dow +0.47%, Nasdaq -1.35%, S&P 500 -0.55%. Jobless claims fell to 189,000; oil and gold rose.
Quoin Pharmaceuticals Reports Third Quarter 2026 Financial Results and Corporate Update
Quoin Pharmaceuticals announced its third-quarter 2026 financial results alongside updates on its clinical pipeline and capital structure.
FingerMotion Announces Non-Binding Expression of Interest for 7 MW Data Center Capacity
FingerMotion, Inc. announced that its subsidiary, Brooks Campus No. 1 Inc., has entered into a non-binding letter of intent for up to 7 MW of liquid-cooled colocation capacity in Alberta.
8-K filing — Quoin Pharmaceuticals Ltd. (QNRX)
Filed: 2026-11-04 AccNo: 0001104659-26-122790 Size: 583 KB Item 1.01: Entry into a Material Definitive Agreement Item 9.01: Financial Statements and Exhibits
FingerMotion Announces Non-Binding Expression of Interest for Up to 7 MW AI/HPC Colocation Capacity at Brooks Campus #1 Expected to Generate in Excess of $100 Million in Contracted Revenue Over Initial Five-Year Term
FingerMotion's subsidiary Brooks Campus No. 1 Inc. has entered into a non-binding Letter of Intent with Cascadia Power regarding up to 7 MW of liquid-cooled AI/HPC colocation capacity at Brooks Campus #1 in Alberta. The arrangement is expected to generate over $100 million in contracted revenue over five years if definitive agreements are reached, with estimated annual revenue of $20-25 million. The facility is designed for NVIDIA GB300 infrastructure and targets initial service delivery within six months.