Kolibri Global Energy Issues Update On Tishomingo Field In Oklahoma; Three Clifton Mack Wells Flowing Back Fracture Stimulation Fluid For ~3 Weeks, Have Continued To Show Higher Production Rates
The new fracture stimulation design has resulted in the wells flowing back differently than our previous Caney wells. We have recovered much more of our fracture stimulation fluid in the first three weeks than in