BrenX Advances Next Construction Phase Of Its 12 MWh bGen TES System At Wolfson Medical Center In Israel
The bGen™ system is designed to replace the hospital's fuel-oil boilers and provide steam and hot water for hospital operations. It charges from the electric grid during off-peak hours and stores that energy for